Lagos - Calabar Coastal Road Construction
Client: Hitech Construction Company Limited Year: 2024 - 2026 Challenge The Lagos—Calabar Coastal Highway traverses one of the most geotechnically challenging terrains in Nigeria. The alignment sits on soft, swampy, and unstable ground, requiring extensive soil replacement and stabilization before...
Reclamation and Channelization Project
Client: Belemaoil Producing Limited Year: 2018 Challenge Roberkiri faced constant flooding and erosion that disrupted production and made the area unsafe for...
Road Construction
Client: Pelfaco Limited Year: 2023 In Bayelsa, our work on the Nembe–Brass Road was about creating lasting access where it mattered most. Commissioned by Pelf...
Reclamation Project
Client: Thomson Energy Services Year: 2023 Challenge At ELIN Oil, every terrain tells a story, and in Okrika, we turned one of nature’s toughest challenges in...
Reclamation Project
Client: Dredging Engineering Works (DEW) Limited Year: 2021 Challenge The Eastern Bye-Pass site was a low-lying, waterlogged area sitting on one of Port Harco...
Nembe-Brass Road Construction
Detailed road alignment and stabilisation works through careful earthworks, levelling, and drainage enhancement.